News > Suki Kinari Hydroelectric Plant
Modeling of Flood Forecasting in Areas of Significant Potential Flood Risk (ARPSI)
The Portuguese Environment Agency (APA) has awarded AQUALOGUS the Modeling of Flood Forecasting in A...
> leia mais
Balakot hydropower scheme in Pakistan
AQUALOGUS is developing the Balakot hydropower scheme Project in Pakistan for the Asian Development ...
> leia mais
H2PORTO - Technological Platform for the Urban Water Cycle
H2PORTO - Technological Platform for the Urban Water Cycle, developed by a Consortium led by AQUALOG...
> leia mais
Suki Kinari Hydroelectric Plant

SK Hydro engaged AQUALOGUS to carry out studies related to the Suki Kinari Hydroelectric Plant, located in the Himalayas, Pakistan, which is financed by the World Bank. It is one of the largest HPP in that country, with an installed capacity of 894 MW, and includes major underground works.
AQL does the close monitoring of the excavation of underground tunnels, including the headrace tunnel with a length of 22,6 km, providing the technical and economic analysis of the real conditions of the excavated rock mass.
The contract started in 2017 and is expected to last 4 years.


AQUALOGUS, 2020-01-29